Scratch

2/11/2015
Antioch, CA

Position Desired

Other Engineering
Antioch, CA; Brentwood, CA; Concord, CA; Danville, CA; Dublin, CA; Hayward, CA; Livermore, CA; Martinez, CA; Oakland, CA; Pittsburg, CA; Pleasanton, CA; San Ramon, CA; Stockton, CA; Tracy, CA; Walnut Creek, CA
Yes

Resume

Skills Summary:
- PDS Modeling (Equipment modeling)
- Smart Plant Review
- Plant 4D (3D Modeling)
- AutoCAD PDMS/CADWorks (3D Modeling)
- EE Raceway Modeling (Duct banks, cable tray etc.)
- Duct Bank layouts (power and communications)
- Electrical Design and Drafting (Power, Lighting, wire and conduit sizing)
- Mechanical Design and Drafting (HVAC Diffuser Sizing, Duct sizing etc)
- Plumbing Design and Drafting (domestic water and waste)
- Project Administration / Management (Gant charts, Punch lists, Vendor relations etc.)
- CAD Administration / Management (Drawing Layout, workload distribution etc.)
- Construction Management (contractor relations, on-site supervision)
- Architectural Design and Drafting (Commercial and Residential)
- Conveyor Systems Design and Drafting (Airport settings)
- Data Communications Layout (Airport Setting)
- D.C. Power applications engineering (Telephone Central Offices, i.e. Qwest, Verizon Wireless)
- Strong supervisory experience in professional engineering settings.
- Strong knowledge of NEC electrical codes and predictive technologies
- Strong knowledge in project estimation of electrical labor, materials and equipment
- Strong organizational and planning skills
- Strong interpersonal communication, organizational and customer service skills
- Strong ability to communicate effectively orally and in writing
- Solid understanding of AC/DC Electronic theory
- Solid project management and communication skills
- Skilled in using electrical schematics and test instruments
- In-depth knowledge of medium voltage distribution and low voltage
- In-depth knowledge of low voltage switchgear maintenance and repair
- Familiarity with electrical apparatus and control circuitry maintenance electrical codes.

Office and Drafting Programs:
- Micro-Station through V8 (14 years+)
- AutoCAD through 2012 (21 years)
- PDMS/CADWorks (3D Modeling)
- PDS Equipment Modeling / EE Raceway (10 years+)
- Plant 4D (2 years)
- Architectural Desktop and Mechanical Desktop (8 years)
- Manual Drafting practices (15 years +)
- Microsoft Office (Word, Excel, Access, PowerPoint and Front Page) (21 years)
- Corel (Word Perfect, Quattro Pro and Presentations) (5 years)
- Adobe Photoshop, Illustrator and In Design (3 years)

Education:
- University of Maryland 1979 – 1984 (Criminal Justice Studies)
- ITT Technical Institute 1995 – 1997 (A.A.S., Computer Aided Drafting Technology)
- SMACNA (1997) - Fundamentals of HVAC Systems, HVAC Systems Applications
- OSHA 30-hour training course in Construction Safety & Health (2007)
- American Red Cross (Standard First Aid/Adult CPR)
- OSCA Northern California RSO (exp 06-19-2015)

Military Service: 1978 - 1989 United States Army – 18B Special Forces Weapons Sergeant




Experience
09/2012 – Present – Electrical/3D Designer – Jacobs Engineers, Long Beach, CA(09/2012 – 06/2013), Richmond, CA (06/2013 – 09/2013), Concord, CA (09/2013 - Present)
Electrical design and layout in 2D and 3D environments. Lighting, Grounding, Details, One Lines, Equipment schedules, Cable Schedules, Physical layouts of PDC’s and Substations, above and underground conduit and duct bank layout and drafting for Rio Tinto Minerals and Electrical infrastructure upgrades to Chevron – Richmond Refinery utilizing PDS, EE Raceway, Microstation and AutoCAD.
Programs utilized: MS Office, Microstation (v7/v8) AutoCAD 2011, AutoCAD 3D, Navisworks, PDS/EE Raceway .
03/2012 – 09/2012 – Electrical/3D Designer – Brinderson Engineers, Costa Mesa, CA;
Design and layout of cable tray, conduit, embedded conduit in AutoCAD/CADWorks (3D Modeling), tray and conduit sizing and fill calculations, assist other designers and engineers with grounding, Lighting and materials take-offs. Primary focus on projects for Olin Alkali Hypure and HCL Projects.
Programs utilized: MS Office, Microstation J(v7), AutoCAD 2012, CADWorks, AutoCAD 3D, Navisworks.
Reason for Leaving: Accept offer at Jacobs Engineering
10/2011 – 03/2012 – Principal Electrical Designer – WorleyParsons, Monrovia, CA;
Design and layout of cable tray, conduit, embedded conduit, tray and conduit sizing and fill calculations, grounding calculations and grid layouts, Area Classification, Power and Lighting layouts, One Line Diagrams, MCC Layouts, Cable Schedules, Load Lists, Interposing Relay Panels and Motor Schematics/list for SAMREF and YANPET refineries in Saudi Arabia.
Programs utilized: MS Office, Microstation J(v7), Microstation v8, PDS, EE Raceway and Smart Plant Review.
Reason for Leaving: Reduction in workforce layoff.
06/2010 – 10/2011 – Electrical/Instrumentation Designer - Olin Corporation, Henderson, NV;
Chlor Alkali Plant working on site. Coordinate with Plant Management, Discipline Engineers, Sub-contractors, vendors as well as site Electrical and Instrumentation craft personnel on Maintenance and Principal projects.
- Budget/man-hour estimates, project scheduling/management, sub-contractor walk-downs and bid selection.
- Creation and upkeep of project drawings, field verification of instruments, valves, power panels etc., and responsible for creation and updates of P&ID’s, loop diagrams, one lines, flow diagrams etc.
- Design and Layout of Motor Control Centers, Sub-Stations, Rectifiers, conductor and breaker sizing, wiring diagrams, controls, instruments, physical layouts of buildings, lighting, PLC layouts, etc.
- Creation and updating Bills of Materials, actual/proposed cost evaluation etc.
- Physically check in progress and finished work of Electricians, Instrumentation Techs to insure work is performed per specified drawings and according to company specifications.
Programs utilized: MS Office, SAP, Documentum, AutoCAD 2008.
Reason for Leaving: Accept position at WorleyParsons.
09/2009 – 06/2010 – Senior Electrical Designer - ICL Performance Products, Lawrence, KS;
Primarily the same responsibilities and duties as outlined in Olin Corporation synopsis.
Programs utilized: MS Office, SAP, Documentum, Microstation, PDS, EE Raceway, Smart Plant Review, AutoCAD.
Reason for Leaving: End Term of contract
08/2007 – 04/2009 – Lead Electrical/3D Modeling Designer - Kiewit Power Engineers, Lenexa, KS;
Projects:
- Panoche Energy Project - Firebaugh, CA; a 400-megawatt simple cycle power plant with four GE LMS100 natural gas-fired combustion turbines.
- Iatan Po...

Login or Register to view the full resume.