Nader

10/27/2014
Torrance, CA

Position Desired

Architectural Engineering
Culver City, CA; El Segundo, CA; Long Beach, CA; Los Angeles, CA; Torrance, CA
Yes

Resume

OBJECTIVE: With many years of dependable, conscientious and cost-effective experience, I am seeking a position in:


FACILITIES: Facilities planning, design, modification, relocation & cost estimates.

ARCHITECTURE: Preparation of tenant-improvement plans, cost estimating, architectural design, code compliance, preparation of working drawings, Building Department submittals.

CONSTRUCTION: Bid process & selection of contractor, construction contract administration, change orders, construction management & supervision.

PERSONAL DATA: B.A. Environmental design, University of California, Berkeley.
Master of Planning, University of Southern California, Los Angeles.

Citizenship: U.S.A.
Computers: Windows, Word, Excel
Personality: Team player, goal-oriented, amicable
Licenses: California General Contractor’s License B, C-36

WORK EXPERIENCE:
• 8/11- Present Consultant, General Contractor, Facilities & Architectural Design &
Construction

Architectural designer and contractor on various commercial, residential,
facilities & remodeling projects. Work included design, cost estimates, Bldg.
Dept. submittals, obtaining permit & construction supervision.

• 12/00 to 8/2011 REALTECH CONSTRUCTION (OWNERS OF CENTURY CITY MEDICAL PLAZA, 3250WILSHIRE BLVD. BLDG., MAPLE PLAZA IN BEVERLY HILLS, WORLD SAVINGS IN BRENTWOOD WEST LOS ANGELES, LA BREA PLAZA, ETC.)
2080 Century Park East, Penthouse, Los Angeles, CA 90067

Position: Director of Architecture & Construction (Salaried)
Supervisor: Jeff Buttikofer
Duties: Duties included meeting with existing and potential tenants, modification of existing, or design of new office, medical, dental, or surgery suites, cost estimating, preparation of construction plans, interior elevations, obtaining Building Dept. permits, coordination of sub-contractors and in-house construction crews, cost control, change orders and construction contract administration.

• 2/99 to 12/00 BOEING DEFENSE & SPACE GROUP
12214 Lakewood Blvd., Downey, CA 90242

Position: Senior Facilities Engineer (Contract)
Supervisor: Allen Avina
Duties: Planning, coordination and supervision of relocating offices, labs, personnel, office equipment, computer and telecommunication systems, etc. from Boeing’s Downey site to its Huntington Beach campus.

• 11/94 to 1/99 CONSULTANT, FACILITIES & ARCHITECTURAL PLANNING, DESIGN & CONSTRUCTION
Architectural consultant on various facilities, commercial, residential & remodeling projections including design, preparation of working drawings, submittals to Building Dept. & construction supervision. Also acting as the general building contractor on some of the above projects.

• 11/89 to 11/94 NORTHROP CORP. (Electronics Systems Division) (Contract)
2301 W. 120th St., Hawthorne, CA 90250

Position: Senior Facilities Planning Engineer
Supervisor: Lothar Hoffmann
Duties: Responsible for planning, coordination and supervision of a variety of architectural, mechanical, electrical, HVAC, plumbing & miscellaneous construction projects involving expansion or alteration of offices, labs, clean rooms, computer rooms, shipping/receiving & storage facilities. Also worked extensively in relocating personnel, equipment & machinery between different sites in Hawthorne & Anaheim.

• 12/88 to 11/89 ROCKETDYNE DIVISION OF ROCKWELL INT’L. (Contract)
6633 Canoga Ave., Canoga Park, CA 91303

Position: Facilities Planning & Layout Engineer
Supervisor: Fredrick Courtney
Duties: Responsible for design, planning & modification of existing office and production areas of Rocketdyne’s various facilities at Canoga Park and Santa Susana Field Lab. Duties also included design and layout of new production and office facilities.

• 4/88 to 12/88 HUGHES AIRCRAFT, RADAR SYSTEMS (Contract)
Facilities Department, El Segundo, CA

Position: Architectural Facilities Designer
Supervisor: Robert Ohls
Duties: Responsible for a variety of projects involving the Hughes Aircraft, Radar Systems’ El Segundo facilities. The projects included construction, rearrangement, or renovation of new or existing office and manufacturing areas. Duties included development of preliminary concept received from the requesting department, preparation of construction documents to be submitted to Building Dept., compliance with applicable codes (U.B.C., Fire & Handicapped requirements), and coordination with in-house electrical and mechanical departments.




• 8/87to 4/88 ALPHA THERAPEUTIC CORP. (Contract)
555 Valley Blvd., Los Angeles. CA 90032

Position: Senior Facilities Engineer
Supervisor: Jim Cannon
Duties: Responsible for preparing plans, defining the scope of work, preparing...

Login or Register to view the full resume.